Composting Plant in ZUOK Trzebien
The process of composting / stabilization takes place in closed chambers with intensive aeration, air push back through
floor channels and sucking post-processing to the biofilter.
The installation consists of the following elements:
-
composting chambers
-
container's biofilter
-
the necessary technical infrastructure
-
system of automatic process control.
Basic parameters:
-
Chamber's area (total): 750 m2
-
Chamber's cubature (total): 637,5 m3
Location
Trzebień (gm. Bolesławiec)
Execution date
07.2013 - 11.2013
Scope of works
building, delivery, assembly and start-up of installation
Plant's capacity
12 240 Mg/year