Composting process is performed by piles' shaping and shifting, it is assisted by the air sucked from channels in the floor. The process takes place in closed ventilated hall. The whole amount of process air is treated at the biofilter. Material’s irrigation is provided by irrigating set integrated with turner.

The installation consists of the following elements:
  •   composting hall (4 piles)
  •   ventilation center
  •   4 water scrubbers
  •   biofilter
  •   compost maturation square
  •   internal roads and squares
  •   necessary technical infrastructure
  •   system of automatic process control.

Basic parameters:
  •  Hall’s area (total): 3 600 m2
  •  Hall’s cubature: 39 000 m3
  •  Usable area of the biofilter:  about 1000 m2
  •  Number of air changes: 3 times per hour
  •  Amount of purified air: 3 048 000 m3 per day

 

Location

Słajsino (Nowogard community)

Execution date

01.2012 - 12.2012

Scope of works

building, delivery, assembly and start-up of installation

Plant's capacity

40 000 Mg/year

Contact

 

AK NOVA Sp. z o.o.
ul. Mrągowska 3
60-161 Poznań

Tel. 61 662 33 93
Fax 61 662 33 31
Email: biuro@aknova.com.pl

© 2016 AK NOVA. All rights reserved.

Realization: Predictes.com

This website uses cookies. You can learn more about the purpose of their using and change the settings of cookies in your browser.
Taking advantage of the website, you agree to using cookies in accordance with the current settings of the browser.

Close X