Municipal Sewage Treatment Plant

a05
a1
a2
a00
a0
a01
a02
a03
a3
a04
a4
a5
Extension and modernisation of existing Municipal Sewage Treatment Plant in Sochaczew.

In terms of project following works were completed:

1. Building of Gratings
  • replacement of the steel structure of the roof, walls’ upgrading, finishing works, insertion of windows and doors, demolition works
  • installation of ventilation equipment, central heating and plumbing installations
  • assembly of technological constructions

2. Extension of Building for Containers
  • construction of the facility with a capacity of 301 m3 in traditional technology, steel structure of roofing, finishing works, insertion of windows and doors
  • installation of ventilation equipment, heating installations
  • assembly of technological constructions

3. Grit Chamber
renovation and extension of the structural elements of reinforced concrete walls, mineral insulations of interior walls, track and exterior walls

4. Sedimentation tank 1
renovation and extension of reinforced concrete cylindrical tank with a capacity of 1 385 m3

5. Sedimentation tank 2
renovation and extension of reinforced concrete cylindrical tank with a capacity of 1 385 m3

6. Extension of closure for the trailer next to sludge dewatering station
  • construction of the facility with a capacity of 396 m3 in traditional technology, steel structure of roofing, finishing works, insertion of windows and doors, demolition works
  • installation of ventilation equipment
7. Shed with the square for sediment storage
  • steel construction (cubature of 3 220 m3, total weight - 62 400 kg, area - 520 m2)
  • monolithic reinforced concrete structure (retaining wall with a length of 72 m, cubature of reinforced concrete - 318 m3)
  • monolithic reinforced concrete’s square (area - 1 036 m2, cubature of reinforced concrete - 259 m3)
  • exchange of ground - total volume - 1 600 m3
  • finishing works, roofing works

8. Associated infrastructure
  • retaining wall - the strengthening of reinforced concrete of retaining wall
  • roads and squares - road constructions, concrete pavements with a total area of ​​825 m2
  • external network (a network of the technological water with a length of 140 m, a length of water supply network - 41 m)

Location

Sochaczew

Execution date

10.2010 - 08.2012

Scope of works

Extension and modernisation of existing municipal sewage treatment plant

Plant's capacity

maximum: 11 636 m3/day

Contact

 

AK NOVA Sp. z o.o.
ul. Mrągowska 3
60-161 Poznań

Tel. 61 662 33 93
Fax 61 662 33 31
Email: biuro@aknova.com.pl

© 2016 AK NOVA. All rights reserved.

Realization: Predictes.com

This website uses cookies. You can learn more about the purpose of their using and change the settings of cookies in your browser.
Taking advantage of the website, you agree to using cookies in accordance with the current settings of the browser.

Close X